{"id":7728,"date":"2018-06-26T11:42:49","date_gmt":"2018-06-26T11:42:49","guid":{"rendered":"http:\/\/www.telecomstalk.com\/?p=7728"},"modified":"2018-06-26T11:42:49","modified_gmt":"2018-06-26T11:42:49","slug":"deploy-a-smart-charging-system-or-face-a-total-collapse-of-consumer-confidence-in-evs-says-off-grid-energy-ceo","status":"publish","type":"post","link":"http:\/\/www.telecomstalk.com\/?p=7728","title":{"rendered":"\u201cDeploy a smart-charging system or face a total collapse of consumer confidence in EV\u2019s,\u201d says Off Grid Energy CEO"},"content":{"rendered":"<p>The company\u2019s UBESS (Universal Battery Energy Storage) systems have been deployed by UPS at its Camden depot, officially launching today <\/p>\n<p>Rugby, UK, 19 June 2018 \u2013 With the power demand from charging electric vehicles too great for the already buckling London power grid, Danny Jones, Founder and CEO of Off Grid Energy \u2013 a leading energy technology company \u2013 today stressed the importance of battery storage and smart charging systems as the take up in EVs increases exponentially.<\/p>\n<p>Earlier this year, UPS \u2013 in conjunction with UK Power Networks Services\u2013 installed Off Grid\u2019s UBESS system which had the task of reinforcing the local grid using battery storage to allow the powering up of the company\u2019s fleet of EV delivery vehicles from the current limit of 65 to all 170 vehicles at its Camden depot. <\/p>\n<p>\u201cThe primary issue with the Camden installation was that the incoming grid supply was insufficient to support the additional power demands of the new fleet of EVs. The cost of re-enforcing the grid at the substation jeopardised the business case for full electrification of the fleet,\u201d said Jones.<\/p>\n<p>Issues such as these are not exclusive to UPS \u2013 EV applications are demanding more power and they need it now. Logistics operations and bus companies are looking to electrify their fleets to help in the fight against air pollution and climate change but are often held back by a lack of grid capacity. <\/p>\n<p>\u201cAt Off Grid, we have the ability to install and have energy storage solutions up and running in a matter of weeks and bring the benefits of battery storage to the fore,\u201d added Jones. \u201cThe benefits of deploying these systems are manifold and are absolutely necessary to prevent a delay in EV deployment because of the cost and lead-in times to reinforce the electricity network at substations, not to mention they can start working right away with minimal installation time needed.\u201d <\/p>\n<p>The UBESS battery storage solution from Off Grid can perform other capabilities over and above the primary function of enabling the introduction and maintenance of the EVs.  For example, when the depot does not need the power, the unit has the ability to provide energy back to the grid for DSR (demand side response) which is a monetizable service for the electricity network operator. The system can also be bolstered with the potential addition of solar panels which can be used for self-consumption and further ROI from the system itself.  <\/p>\n<p>\u201cBattery storage and smart charging systems like UPS Camden are already being adopted in other industries such as bus companies, materials handling corporations, multiple occupancy buildings as well as the car rental sector. Rapidly deployable smart-charging and storage systems are an absolute necessity for cities to reap the benefits of EVs,\u201d concluded Jones. <\/p>\n<p>For more information, please visit http:\/\/www.offgrid-energy.co.uk\/index.php  or contact Rebecca Peel at rebecca.peel@proactive-pr.com<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The company\u2019s UBESS (Universal Battery Energy Storage) systems have been deployed by UPS at its Camden depot, officially launching today <\/p>\n<p>Rugby, UK, 19 June 2018 \u2013 With the power demand from charging electric vehicles too great for the already &#8230; <span class=\"more-link\"><a href=\"http:\/\/www.telecomstalk.com\/?p=7728\" class=\"more-link\">Read More<\/a><\/span><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-7728","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/posts\/7728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7728"}],"version-history":[{"count":1,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/posts\/7728\/revisions"}],"predecessor-version":[{"id":7729,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=\/wp\/v2\/posts\/7728\/revisions\/7729"}],"wp:attachment":[{"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7728"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.telecomstalk.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}